CCAC’s 2023-26 co-design expansion programme kicks off!
Posted on 23rd August 2023

Designers from the Bristol office of global multidisciplinary design practice Arup will join Ashton Gate Primary School in 2024 to work with Year 5 on a transformational local infrastructure initiative set in extreme climate conditions of 2050.

Arup provided civil structural engineering, contaminated land assessment. and transport services
© Arup 2023 All rights reserved
Three architects from the Manchester office of Levitt Bernstein join Springfield Primary School, Sale from September 2023 to work with the students on concepts addressing the effects of climate extremes on the home, the street, and the community.

© Levitt Bernstein 2023 All rights reserved
Designers from Zaha Hadid Architects’ London office will work on topics addressing the 2050 climate changed world with William Tyndale Primary School during spring 2024 and Thornhill Primary School in summer 2024.

© Zaha Hadid Architects 2023 All rights reserved
And..
